Count back from the first booking
The order is: site visit, quote, approval, construction, filling, water balancing. If you ask for a quote in autumn, the pool is comfortably ready before Easter. On islands we also plan around ferry schedules and local crews. See timeline.
Equipment for hard work
- Filter and pump with headroom, so the water is filtered many times a day.
- Salt chlorination with automatic pH control: steady disinfection without daily chlorine by hand.
- Variable-speed pump for lower power bills all season.
- A cleaning robot, so the pool doesn't depend on when the service crew comes.
Send a photo of your garden on WhatsApp. The technician usually answers the same day.
The photo that brings bookings
An overflow turns the surface into a mirror. A dark or mosaic liner gives depth to the colour. LED lights give you a second photo of the same pool, the evening one. And a hydromassage spa beside it becomes a reason to stay longer.

Obligations and safety
Pools at rental properties may have extra requirements depending on the type of operating licence. What applies to you is for your engineer to define. We take care of the technical side: depth markings, suction covers, non-slip steps.






